Bridges Ongoing Projects

1. Title : Construction Of Railway Over Bridge  X-Ling No 236, Section Jabalpur-Itarsi (MP)

Associated Client : MP-PWd Bridge Division Hoshangabad
Location : Pipariya, Hosangabad (MP)
PAC : 1663 Lacs
Project Description : Length – 622.24 Mtrs., Width – 12 Mtrs
Foundation – Pile
Sub-Structure – Circular Piers
Super-Structure – T-Beam
Ari Walls

 

—————————————————————————————————————————————————–

2. Title : Road Over Bridge Pipariya, Hoshganabad, (MP)

Road Over Bridge Pipariya, Hoshganabad, MP

—————————————————————————————————————————————————–

3. Title : Construction of High Level Bridge across Tapti River at Betul (MP)

Associated Client : Madhya Pradesh Rural Road Development Authority
Location : Betul (MP)
PAC : 681.22 Lacs
Project Description : Total Length – 285 mts. , width –  8.4 mts.
Foundation – Open
Sub-Structure –  RCC Wall type Pier
Super-Structure – Solid Slab , 15 mts. each

 

—————————————————————————————————————————————————–

4. Construction of submersible bridge across Tanduni River at Bareli Dist. Raisen (MP)

Associated Client : MP-PWd Bridge Division Bhopal
Location: Magardha To  Silewar (MP)
PAC : 577.87 Lacs
Project Description : Bridge Length – 52 mts. , width –  8.4 mts.
Foundation – Open
Sub-Structure –  Box Type Bridge

 

—————————————————————————————————————————————————–

 

5. Construction of High Level Bridge Across Betwa River at Raisen (MP)

Associated Client : Ashish Infracon Pvt. Ltd., Gujarat
Location: Betul (MP)  
Project By : NHAI  
PAC : 2863 Lacs
Project Description : Total Length – 210 mts. , width –  12 mts.
Foundation – Open & Pile
Sub-Structure –  Y deck
Super-Structure – PSC Girder with Lunching

 

 

—————————————————————————————————————————————————–

6. Construction of High Level Bridge Across Marond River on Bijadehi to Dudar at RD MP03, B-12, Betul (MP)

Length : R D 3550 KM
Cost of Projects : 328.47 Lacs

—————————————————————————————————————————————————–

7. Construction of High Level Bridge Across Marond River on Bijadehi to Dudar at RD MP03, B-14, Betul (MP)

Length : R D 1100 KM
Cost of Projects : 381.24 Lacs